Apartments For Sale 2-Room, Sofia, Hladilnika - 92 m², ID 56881586
Two-Room Apartment in the Premium Fedora Building in Hladilnika, Sofia
A two-room apartment with a built-up area of 74.52 sq. m and a total area of 91.85 sq. m is offered for sale in the premium-class Fedora building. It is located on the third of eight floors.
Layout
- Living room with kitchenette – 29.24 sq. m
- Bedroom – 13.16 sq. m
- Walk-in wardrobe – 2.82 sq. m
- Bathroom with toilet – 3.83 sq. m
- Entrance hall – 8.27 sq. m
- Terrace – 4.23 sq. m
Property Details
- Orientation: north-east / south-east
- Underfloor heating with an installed heat pump and cooling via convectors
- An underground parking space with a storage room is available for purchase
Location
The building is located in the Hladilnika district, on Filip Kutev Street.
- Five minutes’ walk to Vitosha metro station, Paradise Center mall, a hypermarket and Vita Hospital
- South Park and Sofia Zoo are a five-minute drive away
- Bus stops for lines 98, 64, 66, 68 and 109 nearby
- Kindergartens and schools in the area
Building
The eight-storey mixed-use building comprises a ground floor with a restaurant, two office floors and five residential floors with five apartments per floor.
- Monolithic reinforced concrete load-bearing structure
- External walls of 25 cm ceramic bricks, insulated on the outside with 10 cm of stone wool and finished as a ventilated façade system
- Walls between apartments of 25 cm ceramic brick; internal walls within the apartments of 12.5 cm
- All brick walls in living and service rooms finished with plaster and filler
- Common areas and stairs to be finished with engineered stone tiles
- Underfloor heating planned in all living rooms except pantries and entrance vestibules
- Open-work glass terrace railings of triplex frosted glass with a metal handrail
- Aluminium thermally broken windows with double glazing – triplex inner pane on the office floors and standard on the residential floors, four-season outer pane
- Armoured apartment entrance doors with EI60 fire resistance, sound insulation and three-point locking
- Forty-nine underground parking spaces for cars, three of which for people with disabilities, plus fifty-seven bicycle parking spaces
- One lift for nine persons, connecting the garages, the ground floor, the office and residential floors
Construction Stage
- Current stage: Act 15
- The building is scheduled to be put into operation in December 2026
- High-quality construction
