Apartments For Sale 3-Room, Sofia, Pavlovo - 96 m², ID 44528415

Three-Room Apartment in a New Building near Tsar Boris III Blvd. in Pavlovo, Sofia

A three-room apartment in a unique location is offered in a residential building under construction in the Pavlovo district, Gardova Glava area, on a street 250 m from Tsar Boris III Blvd. The area is close to main boulevards and public transport, yet at the same time it is a quiet and peaceful place with clean air.

Location

Nearby:

  • School and kindergarten
  • Fantastico and Lidl supermarkets
  • Various institutions
  • Pharmacy, bank and more

Building and Construction

The building consists of two sections joined along a party wall, each with its own entrance. With a luxurious and modern architectural look, it is being built by a distinguished construction and investment company to a bespoke design project that will give it style and uniqueness.

  • Modern, high-quality materials and contemporary construction technology
  • Reinforced concrete structure with waterproof concrete
  • Seven-chamber joinery with triple glazing in Wenge colour
  • Wienerberger brick masonry
  • Fully ventilated suspended facade
  • Eight-person Otis lifts
  • Gas heating with the necessary installation
  • Common parts with granite flooring on landings and stairs, and walls with granite and aluminium composite panel elements
  • Custom-made, metal, armoured and thermally insulated apartment front doors
  • Automatic garage doors with remote control
  • Homes offered with plaster and screed

The Apartment

The apartment is A 211 on the 4th floor in section 2, with south, east and north exposure, balconies off the living room and bedroom, and a storage room of 5.16 sq. m (priced at EUR 1,250 per sq. m).

Price and Terms

  • Further three-room apartments on different floors, as well as two-room and one-room apartments, are available in the building at EUR 1,850 per sq. m
  • Storage rooms: EUR 850 per sq. m
  • Garages: EUR 1,200 per sq. m; parking spaces also available
  • Prices include VAT
  • Payment terms by agreement with the developer

Construction Stage

  • Act 14 obtained
  • Act 15 expected at the end of 2025
  • Act 16 expected in mid-2026

Similar properties

Menu